Blog Kitchen advice

How Long Does It Take to Fit a New Kitchen? Each Stage Explained

Most K4 kitchen installations take from one day to a week on site, depending on the size of the kitchen and how much work it needs. Before that, your kitchen is made to order, and delivery usually takes 4 to 6 weeks after you order. The whole process, from your first call to your finished kitchen, has a few more stages. Here is what happens at each one.

In this article
  1. Before the fitting: design and ordering
  2. The fitting: what happens on site
  3. When the kitchen is finished
  4. Can I live at home while my kitchen is fitted?
  5. What can make it take longer?
  6. Questions

Before the fitting: design and ordering

  1. Your first call. You call us, or contact us through the website, and we book a visit. It helps if everyone who will make the decision can be there.
  2. The design visit. A member of our team visits your home, measures the room and talks through the layout, appliances, worktops, lighting, sink, tap, and door styles and colours. We bring door and worktop samples with us. The visit is free, with no obligation.
  3. Design and costs. Back at our office, we design your kitchen with ArtiCAD software and work out the costs. We then visit you again to go through the design and the costs, and note any changes. This second visit is also free.
  4. Your quotation. We email you the full quotation and plan, which you can accept online.
  5. Ordering. We order everything in your quotation. Your kitchen is made to order, so we wait for our suppliers’ delivery dates, then contact you to agree your fitting dates. Delivery usually takes 4 to 6 weeks, depending on how busy our team is, our suppliers’ stock and how complex the job is.

The fitting: what happens on site

Fitting usually takes from one day to a week. The work usually runs in this order:

  1. Taking out the old kitchen. We remove your old kitchen and dispose of it responsibly, and protect your home while we work.
  2. Preparation. We check the walls, floors and services, and do any building, plumbing or electrical work the new layout needs.
  3. Cabinets and worktops. Our own employed fitters fit the cabinets, then the worktops.
  4. Appliances, sink and tap. We fit your appliances, sink and tap, and make the plumbing and electrical connections.
  5. Finishing. Tiling, flooring and the finishing touches, followed by our final checks.

When the kitchen is finished

We clean up, make sure the waste has been collected, and show you how to look after your new kitchen. We also go through your guarantees with you.

Can I live at home while my kitchen is fitted?

In most cases, yes. Many of our customers stay at home while we fit their kitchen. How long you are without a working sink or cooker depends on the job, and we work hard to cause as little disruption as possible. We plan the work carefully and tell you what to expect at each stage, so you can plan around it. It helps to set up a small temporary kitchen in another room, with a kettle, a microwave and the fridge if it can be moved.

What can make it take longer?

  • Delivery dates. Kitchens are made to order, so the start date depends on when our suppliers can deliver.
  • Changes after ordering. Changing the design once the order is placed can mean re-ordering parts.
  • Surprises behind the old kitchen. Problems such as damp or old wiring sometimes only show once the old kitchen is out. Our survey checks the walls, floors and services first, to find as much as possible early.
  • Building work. Taking out a wall or moving the sink adds time, because more trades are involved.

Questions

Who fits the kitchen?

Our own employed fitters, not subcontractors. One local team manages the whole job, from design to the final clear-up. See how K4 compares with the national kitchen companies.

Do you organise the plumber and electrician?

Yes. We organise every trade the kitchen needs, so you do not have to find and manage separate contractors. Our own employed fitters are multi-skilled.

How long does the whole process take?

From the first visit to the finished kitchen, it depends mainly on how long your kitchen takes to make and deliver, which is usually 4 to 6 weeks after you order. Fitting then usually takes from one day to a week. We give you your fitting dates as soon as our suppliers confirm delivery.

Book your free design visit

See every step in more detail on our customer journey page, or book your free design visit: call 01227 456567, Monday to Friday, 9am to 5pm, or use the form below.

More from the K4 blog

All articles

10/10

Rated Excellent on Checkatrade

From 137 customer reviews

What our customers say

“The fitters were punctual, polite and very hard working.”

10/10 on Checkatrade · Deal, May 2026

Prefer to talk? Call 01227 456567 Monday to Friday, 9am to 5pm

Get your free quote

Leave your name and number. We will call you to arrange your free design consultation.

    We reply the same working day. No obligation.